Skip to content

DESTINY RADIO 96.7 FM

News and music radio station located in Brgy. Calumpang, Tayabas City

Primary Menu
  • Home
  • Live Streams
  • Weather Updates
  • International
  • National
  • Regional
  • Local
  • About us
Videos
  • Home
  • National News
  • DOE Drafts Guidelines for Data Center Power Supply Amid Pax Silica Concerns
  • National News

DOE Drafts Guidelines for Data Center Power Supply Amid Pax Silica Concerns

Admin July 29, 2026 2 min read

As of July 28, the Philippine Department of Energy (DOE) is drafting a new circular to establish guidelines for supplying electricity to data centers, a move prompted by ongoing discussions surrounding the proposed Pax Silica Industrial Hub in New Clark City, Tarlac.

Energy Secretary Sharon Garin stated that the department is formulating standard procedures for integrating data centers into the power grid. While she noted that the country has the capacity to supply power demands ranging from 50 to 5,000 megawatts, she emphasized that new projects must not disadvantage the broader public. The framework aims to ensure that energizing these facilities does not compromise the electricity supply for regular consumers.

The Pax Silica project is a joint initiative between Manila and Washington designed to create a 4,000-acre industrial park for AI-focused investments within the Luzon Economic Corridor. However, the development has faced scrutiny from environmental and progressive groups concerned about its social and ecological footprint. Data centers rely on high-performance computers that generate significant heat and require massive cooling systems. Similar AI facilities in other countries have been reported to consume up to 5 million gallons (about 18.9 million liters) of water for operations, raising concerns about the potential strain on local water resources.

Addressing the logistics of the project’s energy needs, DOE Undersecretary Rowena Guevarra explained that securing a reliable power supply will depend on long-term commitments from the hub’s tenants. Because energy companies typically require 20 years to recover the costs of building new power plants, the government is focused on securing two-decade pledges from Pax Silica locators. According to Guevarra, securing these commitments will give power generators the confidence they need to supply electricity to the facility/Clarence Pacaña

Continue Reading

Previous: DepEd Fast-Tracks Marcos’ SONA Directives: 65K New Hires, Tens of Thousands of Classrooms, and Major SHS Reforms
Next: Following Marcos’ SONA, Gatchalian calls for ongoing economic reforms

Related Stories

Habagat Brings Heavy Rains to Luzon and Western Visayas
1 min read
  • National News

Habagat Brings Heavy Rains to Luzon and Western Visayas

August 10, 2026
House Suspends Monday Session, Shifts Personnel to WFH Amid Heavy Rains
1 min read
  • National News

House Suspends Monday Session, Shifts Personnel to WFH Amid Heavy Rains

August 10, 2026
AboitizPower, KHNP Partner to Explore Nuclear Energy Technologies in the Philippines
1 min read
  • National News

AboitizPower, KHNP Partner to Explore Nuclear Energy Technologies in the Philippines

August 6, 2026

Recent Posts

  • QPPESO Conducts Two-Day SPES Recruitment in Lucena for Students in Quezon
  • Habagat Brings Heavy Rains to Luzon and Western Visayas
  • House Suspends Monday Session, Shifts Personnel to WFH Amid Heavy Rains
  • Governor Helen Tan Visits PCSO to Push for LINAC Facility at QPHN–QMC
  • Pineapple Processing Training Conducted to Strengthen Livelihoods of Farmers in General Luna

You may have missed

QPPESO Conducts Two-Day SPES Recruitment in Lucena for Students in Quezon
1 min read
  • Local News

QPPESO Conducts Two-Day SPES Recruitment in Lucena for Students in Quezon

August 10, 2026
Habagat Brings Heavy Rains to Luzon and Western Visayas
1 min read
  • National News

Habagat Brings Heavy Rains to Luzon and Western Visayas

August 10, 2026
House Suspends Monday Session, Shifts Personnel to WFH Amid Heavy Rains
1 min read
  • National News

House Suspends Monday Session, Shifts Personnel to WFH Amid Heavy Rains

August 10, 2026
Governor Helen Tan Visits PCSO to Push for LINAC Facility at QPHN–QMC
1 min read
  • Local News

Governor Helen Tan Visits PCSO to Push for LINAC Facility at QPHN–QMC

August 10, 2026
Copyright © All rights reserved. 2024 | MoreNews by AF themes.